Well things are progressing apace with the bathroom. The plasterer was due to come on Wednesday, but as the outside wall is a little dodgy, Simon wants to remortar it up, so plasterer is coming on Monday instead.
The toilet, sink and bath were all dispatched to the tip at the weekend. I had my last bath on Saturday night. It's only Monday and already I'm craving my lovely bubbly water. It's gonna be at least a month (likely longer) before I get the chance to have another one.
Still it will be worth it. Tiles have been picked. Mainly large white ones with some gorgeous, deep blue, small glass tiles - which will create a long vertical mosaic-ish panel on the wall where the bath goes, and another panel echoed on the opposite wall. Now that we don't have a cat that wees and poos everywhere, the laminate flooring is going. I hate it in the bathroom. Makes the room so cold. A nice navy blue or deep teal carpet would look lovely in there. Oh and we still need to choose our bath, toilet, sink and radiator.
On the 'other' front - I'm feeling much better today. I'm not sure there would be much benefit to me having another week off work despite being signed off so I will see how I am tomorrow and probably take myself back to work on Wednesday.
No comments:
Post a Comment